What is the delivery time for a small air separation unit?

If you’ve ever needed a small air separation unit (ASU) — whether for a small brewery, a research lab, a medical clinic, or a manufacturing shop that needs custom oxygen or nitrogen for low-volume runs — one of the first questions you’ll ask is, “how long until I get it?” As a supplier who’s been building these compact units for over a decade, I can tell you the answer isn’t as straightforward as you might think. It depends on a bunch of factors, not just a generic “3 weeks” or “6 months.” Let’s break that down like I would when chatting with a customer who just reached out for a quote. Small Air Separation Unit

First, let’s get clear on what a “small air separation unit” actually is, because that’s where a lot of the confusion starts. When most people say “small ASU,” they’re not talking about the big industrial units that fill entire warehouse spaces and produce thousands of cubic meters of gas per hour. Those big guys have standardized build schedules and long lead times. No, small ASUs are the ones that produce anywhere from 1 to 50 cubic meters of gas per hour — enough for a 500-liter brewery’s nitrogen purge, a small hospital’s backup oxygen, a university’s chemistry lab, or a metal shop’s plasma cutting rig. That size range is where we (as a small supplier) operate, and that’s where delivery timelines shift the most.

Now, let’s talk about the biggest variable: whether you need a stock unit or a custom build. If you’re looking for an off-the-shelf unit that’s our most popular model — say, the 10 cubic meter per hour nitrogen unit, or the 15 cubic meter per hour oxygen unit — we usually have that on our shelf, fully assembled, tested, and ready to ship. For those, the delivery time is usually 1 to 2 weeks. We can get it crated, booked with a courier, and on its way to you in that window. Last month, a craft brewery in Ohio ordered one of our standard models on a Tuesday, and it was on their loading dock the following Friday. That’s the sweet spot for standard orders.

But here’s the thing: not every customer can use a standard unit. Some have unique needs. For example, a research lab might need the unit to operate on 240V single phase instead of our standard 480V three phase, because their building’s electrical system can’t handle the higher voltage. Or a medical clinic might need a system that’s compliant with their country’s strict medical gas regulations, which means adding extra safety sensors and a specific pressure regulator. Or a metal fabricator might need both oxygen and nitrogen from the same unit, instead of just one gas, which requires a dual-gas separation column we don’t stock. That’s when we move from stock to custom, and that’s where lead time goes up.

Custom small ASUs usually take 4 to 8 weeks. Wait, why the range? Let’s explain the steps, because that’s what adds the time. First, when you place a custom order, we don’t just grab a pre-built part and put it together. We start with your specs: how much gas do you need per hour? What purity? What voltage is available at your facility? Do you have space for a compact footprint, or can we make it a bit bigger to keep costs down? We also ask about your location, because shipping a unit to Alaska is different than shipping to Florida, but that’s more for after it’s built.

Once we have your specs, our engineers draw up the blueprints, adjust the components — things like the filter, the compressor, the distillation column, the control panel — to fit your needs. That design phase takes about a week for small, simple custom adjustments. Then, we order any specialized parts. Most of the standard components we use (like the compressors and sensors) are in-stock with our local suppliers, but if we need a specific control module or a non-standard pressure gauge, that can add a few days. For example, last quarter, a brewery in Texas needed a unit with a touchscreen control panel instead of our standard digital readout, and that specific touchscreen was backordered for 10 days, which pushed their delivery to 6 weeks instead of the usual 4.

Once the parts are here, we assemble the unit. Our shop is small — we only have two assembly bays, so we can usually handle two custom builds at a time — so if another customer just placed a custom order, yours might have to wait a day or two to get space. Assembly takes about a week for a small custom unit. Then, we test it rigorously. We hook it up to our test gas lines, run it for 24 hours straight to make sure there are no leaks, check the gas purity, adjust the flow rate to match your order, and make sure all safety features (like over-pressure shutoffs and fire suppression) are working. That testing phase adds another 5 to 7 days, because we won’t ship a unit that doesn’t perform — we’ve had customers tell us other suppliers shipped units that failed their first test run, and that’s a nightmare for their operations.

After testing, we crate it for shipping. Small ASUs are delicate — all the parts are precise, so we wrap them in foam, bolt them to a wooden pallet, and label all the gas lines and electrical connections so you don’t mess up installation. Crating and shipping prep takes a couple of days, and then we coordinate with a freight company. If you’re in the contiguous US, freight usually takes 1 to 3 days, so total from order to delivery is around 5 to 8 weeks for custom, depending on backorders.

Wait, but what about international orders? That’s a whole other bucket. If you’re outside the US, even if you order a standard unit, you have to add time for customs, shipping, and any regulatory approvals. For example, a customer in Canada ordering our standard nitrogen unit would have to get it certified for Canadian gas standards, which adds about 2 weeks. A customer in the EU might need a CE mark, which adds another week. International orders almost always take longer — usually 6 to 12 weeks, even for stock units — because of paperwork and customs delays. Last year, a winery in Italy ordered a standard unit, and it took 10 weeks total, mostly because their customs office held it for 10 days to inspect the technical documentation.

Now, let’s talk about exceptions, because there are always things that can push delivery time out. The biggest one is component shortages. Over the last few years, supply chains have been wonky, and parts like compressors and sensors can be backordered for weeks or even months. Last summer, a compressor we use had a 6-week backorder, so all custom units ordered that month were delayed. We always try to warn customers upfront if there’s a backorder on a key part — we don’t like to keep people in the dark — and we might offer a temporary workaround if possible, like renting a smaller unit while you wait.

Another exception is rush orders. We get requests all the time from customers who need a unit in 2 weeks for a big job — like a brewery that’s expanding and forgot to order their nitrogen, or a clinic that’s having an old oxygen unit replaced. If we have extra space in the shop, and the parts are in stock, we can do a rush build for you. We charge a 15% rush fee, but we can get standard units out in 5 to 7 days, and simple custom builds in 10 to 14 days. Last month, a construction company needed a unit for a site in Arizona, and we got it built and shipped in 7 days so they could start their plasma cutting work on time. It’s not something we can do every time, but if you reach out and have a tight deadline, let us know — we’ll do our best to work with you.

Also, don’t forget about installation time, even though that’s not part of the delivery time. Some customers think delivery is just when the unit arrives at their door, but you still need to have a technician hook up the gas lines, test the connections, and get the unit running. For small ASUs, installation usually takes 1 to 2 days, but if you’re not handy with electrical or gas work, you’ll need to hire a local tech, which can add a few days or a week depending on your location. We offer optional on-site installation for an extra fee, so if you don’t want to handle that part, just ask.

Let me give you a few real examples from the last year to make this concrete. In January, a research lab in Illinois ordered a standard 10 cubic meter per hour oxygen unit, stock, so it was delivered in 10 days. No issues, just a standard order. In March, a small metal shop in Michigan ordered a custom dual-gas unit, needed both oxygen and nitrogen, and it was delivered in 6 weeks — we had to adjust the distillation column, and a sensor was backordered for 10 days. In June, a brewery in Australia ordered a standard nitrogen unit, so we added 2 weeks for CE certification and international shipping, and it arrived in 8 weeks total. In August, a winery in California had a rush order, needed the unit in 12 days for harvest season, we did a rush build, and it was delivered in 11 days, including shipping.

A lot of customers get confused because some big suppliers quote super long lead times — like 12 weeks or more — but that’s for their big industrial units, not the small ones we build. As a small supplier, we don’t have a huge backlog of big orders, so we can turn around small ASUs faster. We prioritize small and medium businesses because that’s our niche — we don’t compete with the giants who sell to Fortune 500 companies. That means your order isn’t stuck behind a 100-cubic-meter unit for a big factory; we can focus on getting your small unit built and shipped quickly.

If you’re wondering about warranties, that’s another thing that ties into delivery time. All our small ASUs come with a 1-year parts warranty, and we test every unit before it leaves, so you won’t have to deal with surprises after it arrives. If there is a problem, we can ship a replacement part to you within 3 days, no matter where you are, so your downtime is minimal.

So, to wrap this up: the delivery time for a small air separation unit is basically:

  • 1 to 2 weeks for standard stock units in the contiguous US
  • 5 to 8 weeks for custom small ASUs in the contiguous US
  • 6 to 12 weeks for international orders (stock or custom, plus regulatory and shipping time)
  • 10 to 14 days for rush orders (if we can accommodate your timeline)

Every order is different, though, so the best way to get an exact delivery time is to reach out with your specs. Tell us what gas you need, how much, what your space and electrical needs are, and your location, and we’ll give you a clear timeline, no fluff, no hidden delays. We’re not the kind of supplier who will quote you a 2-week lead time just to get your business and then push it back. We’re here to help you get the unit you need, when you need it, without the hassle.

If you’re ready to talk about your small air separation unit, just reach out. We can answer all your questions, give you a custom quote, and lock in a delivery time that works for you. No pressure, just straight talk — that’s how we do things here.

Cryogenic Liquid Storage Tank References

  1. Gas Processors Suppliers Association. (2020). Engineering Data Book, 15th Edition.
  2. Compressed Gas Association. (2021). Standards for Small Air Separation Units.
  3. International Organization for Standardization. (2022). ISO 817: Refrigerating and air-conditioning systems and heat pumps.
  4. U.S. Small Business Administration. (2023). Manufacturing Timelines for Compact Industrial Equipment.
  5. Air Separation Equipment Manufacturers Association. (2022). Lead Time Benchmarks for Small-Scale ASUs.

Xinxiang Jiale Intelligent Equipment Co., Ltd.
As one of the most professional small air separation unit manufacturers and suppliers in China, we’re featured by quality products and good service. Please rest assured to buy durable small air separation unit for sale here from our factory. We also accept customized orders.
Address: No.3913, 9th Floor, Unit 3, East Commercial and Office Complex, Baolong City Plaza, Hongqi District, Xinxiang City, Henan Province, China
E-mail: cc2397410@gmail.com
WebSite: https://www.jiale-asu.com/